







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Construction Cost in Seattle?
Construction in Seattle typically costs between $106,200 and $259,600 for a full-scale residential project such as an ADU, with most remodels landing well below that band. A kitchen remodel generally runs $16,520 – $53,100, a bathroom remodel $10,620 – $33,040, and a roof replacement $9,440 – $23,600. These are estimated ranges for the Seattle market in 2026; the written estimate we prepare for your project sets the final price.
We’re Bellevue Remodeling Pros, and we help homeowners across Seattle plan, source, and build remodels that hold their value. Our technicians have up to 14 years of experience, and we bring a wide portfolio of named brand relationships to every job, from Cambria and Silestone quartz to KraftMaid and Wellborn cabinetry. Call (425) 675-0145 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.

Key Takeaways
- Full-scope projects like an ADU construction run $106,200 – $259,600 in Seattle.
- Kitchen remodels land at $16,520 – $53,100; bathroom remodels at $10,620 – $33,040.
- Home additions run $53,100 – $153,400 depending on size and structure.
- Material choice, Seattle’s wet climate, and permit requirements drive most of the spread.
- Estimates are free, and the written estimate is what sets your final price.
Construction Cost Breakdown (2026)
Here’s how the main residential construction categories price out in Seattle this year. Every figure is a typical estimated range, and the written estimate for your specific project is what determines the final number.
| Project | Typical Estimated Range |
|---|---|
| ADU Construction | $106,200 – $259,600 |
| Home Addition | $53,100 – $153,400 |
| Garage Conversion | $35,400 – $94,400 |
| Kitchen Remodel | $16,520 – $53,100 |
| Small Kitchen Remodel | $10,620 – $23,600 |
| Bathroom Remodel | $10,620 – $33,040 |
| Small Bathroom Remodel | $5,900 – $14,160 |
| Roof Replacement | $9,440 – $23,600 |
| Window Replacement | $5,310 – $17,700 |
| Flooring, cabinetry, and finish work | Priced per job by written estimate |
Kitchen and Bathroom Line Items
Because kitchens and bathrooms carry so many separate decisions, it helps to see the components priced on their own.
- Cabinet installation: $4,720 – $15,340
- Countertop installation: $2,360 – $7,670
- Backsplash installation: $945 – $2,950
- Kitchen island installation: $3,540 – $11,800
- Bathroom vanity installation: $945 – $3,540
- Walk-in shower installation: $5,310 – $14,160
- Tub-to-shower conversion: $4,130 – $11,800
- Shower replacement: $3,540 – $10,030
Exterior Line Items
- Metal roof installation: $17,700 – $47,200
- Roof repair: $470 – $2,125
- Tile roof repair: $710 – $2,950
- Paver driveway installation: $8,260 – $21,240
- Concrete driveway installation: $5,310 – $14,160
- Asphalt driveway paving: $4,130 – $10,620
- Driveway replacement: $5,900 – $16,520
- Driveway sealing: $295 – $825
- Paver patio installation: $4,130 – $12,980
- Vinyl fence installation: $4,130 – $10,620
- Aluminum fence installation: $4,720 – $11,800
What drives these numbers up or down? The two biggest levers are material grade and structural scope. A semi-custom cabinet line with soft-close hardware and a quartz surface sits at the top of the kitchen range; a paint-and-refresh project sits near the bottom. On the exterior, a full roof replacement costs far more than a targeted repair, and a paver driveway costs more than sealing an existing one. The rest is structural: moving a wall, adding plumbing, or building a foundation pushes a project into a different tier entirely.

What Affects Construction Pricing in Seattle
Seattle has a few local conditions that shape what your project will cost compared with other markets.
- Wet-season construction windows. Seattle’s long rainy stretch means exterior work like roofing, siding, and driveway paving has to be scheduled carefully around weather. A dry-weather window can mean work happens faster and with less material waste.
- Older housing stock in established neighborhoods. Homes in areas like Ballard, Wallingford, and Beacon Hill were often built decades ago, so a remodel may uncover outdated wiring, plumbing, or framing that needs correcting before finish work begins. That’s why a written estimate is based on a walkthrough, not a phone conversation.
- Hillside and slope conditions. Parts of West Seattle and Queen Anne sit on grades that require engineered foundations or retaining structures for additions and ADUs. Site work adds cost before a single finish material is chosen.
- Permit and inspection requirements. Most structural work, additions, ADUs, and roof replacements require permits from the city. Permit fees and inspection timelines vary by scope, so ask your city’s building department what applies to your project before you budget.
- Material selection. This is where homeowners have the most control. Choosing between Cambria, Silestone, and Caesarstone quartz, or between KraftMaid and Wellborn cabinetry, changes the price of a kitchen directly. So does fixture selection across Kohler, Toto, Grohe, Moen, Delta, American Standard, and Blanco.
- Scope of trades involved. A project that touches framing, electrical, plumbing, tile, and paint costs more to coordinate than a single-trade job. A single-company scope across remodeling, flooring, and painting reduces scheduling gaps and rework.
For a broader look at how we approach residential work across the region, see Bellevue Remodeling Pros.
How to Save on Construction in Seattle
You don’t need to chase the lowest bid to keep a Seattle remodel on budget. You need to make decisions in the right order and know where material grade actually matters.
- Lock materials before demolition. Changing a countertop or cabinet line mid-project is the single most common cause of cost overrun. Choose your quartz and cabinetry up front so the written estimate reflects reality.
- Prioritize the parts you touch every day. Spend on the countertop, cabinet hardware, and fixtures you use daily. Save on items that are purely visual.
- Bundle related work. Painting and flooring scheduled alongside a kitchen remodel costs less than booking them separately later. One coordinated scope means one mobilization, not two.
- Handle exterior work in the right season. Roofing and driveway work scheduled for the drier months reduces weather delays and material waste.
- Ask what’s included in writing. A clear estimate separates labor, materials, permits, and disposal. Vague line items are where budgets break.
- Get a free estimate before you commit to a scope. Call (425) 675-0145 and we’ll walk through what your project actually requires.
Where Brand Choice Changes the Number
Material brand is one of the few cost levers a homeowner fully controls. We install Cambria quartz because it’s non-porous, scratch-resistant, and backed by a full warranty, and we also work with Silestone and Caesarstone so you can compare surface options side by side. On cabinetry, KraftMaid and Wellborn are both semi-custom lines built for long service in a working kitchen. We help you select, source, and install without the runaround between contractor and supplier.
Fixture choice works the same way. Whether you prefer Kohler’s design-forward aesthetic or Toto’s engineering precision, we work with both, along with Grohe, Moen, Delta, American Standard, and Blanco. That range means your bathroom or kitchen isn’t limited to whatever one supplier happens to stock.
FAQs – Construction Cost
How much does a kitchen remodel cost in Seattle?
A kitchen remodel in Seattle typically costs $16,520 – $53,100, with small kitchen remodels at $10,620 – $23,600. Cabinet installation alone runs $4,720 – $15,340 and countertop installation $2,360 – $7,670. Call (425) 675-0145 for an exact quote – estimates are free.
How much does an ADU or home addition cost in Seattle?
ADU construction in Seattle typically runs $106,200 – $259,600, and a home addition $53,100 – $153,400. Garage conversions fall in the middle at $35,400 – $94,400. These projects involve foundations, permits, and multiple trades, so the written estimate is essential – call (425) 675-0145 to start.
Is it cheaper to repair or replace a roof in Seattle?
Roof repair in Seattle typically costs $470 – $2,125, while a full roof replacement runs $9,440 – $23,600. If damage is isolated to a small area, repair is almost always the lower-cost path; widespread wear or age usually points to replacement. Call (425) 675-0145 and we’ll assess which applies to your roof.
How much does a bathroom remodel cost in Seattle?
A bathroom remodel in Seattle typically costs $10,620 – $33,040, with small bathroom remodels at $5,900 – $14,160. A walk-in shower installation runs $5,310 – $14,160 and a tub-to-shower conversion $4,130 – $11,800. Call (425) 675-0145 for a free estimate on your bathroom.
Can you come today?
Same-day service is often possible. We answer 24/7, and fast dispatch runs from 7am to 7pm, Sunday through Friday. A call outside dispatch hours is booked into the next opening, Sunday through Friday, 7am to 7pm. Call (425) 675-0145 to check availability.
Get Your Seattle Construction Estimate
Every project on this page is priced per job by a written estimate, so the ranges you see are a starting point, not a quote. We walk the space, talk through material choices from quartz surfaces to cabinetry lines to fixtures, and put the numbers in writing. Our technicians have up to 14 years of experience, and we handle remodeling, flooring, and painting under a single-company scope so you have one point of contact from demolition to final coat.
Call (425) 675-0145 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Bellevue Remodeling Pros.
Pricing reflects the Seattle market as of 2026. Bellevue Remodeling Pros offers free estimates – call (425) 675-0145.
What Our Customers Say
"The foundation survey came back dead on. Everything downstream of that being square is the reason the rest of the build went smoothly."
- Wade Fletcher"Weekly site meeting, every week, with a written summary afterward. I always knew where the money and the schedule stood."
- Daniel Barrett"Ground up build. Permits, foundation, framing, all of it, and he ran the schedule tightly enough that the subs were never tripping over each other. Finished within a month of a fourteen month estimate."
- Nabil Mansour












