







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Construction Cost in Mercer Island?
Most construction projects on Mercer Island in 2026 land between $90,000 and $220,000 for a full-scope remodel or an ADU build. Smaller jobs sit well below that: a bathroom remodel typically runs $9,000 – $28,000, a kitchen remodel $14,000 – $45,000, and a roof replacement $8,000 – $20,000. The written estimate you get after we walk the property sets the final price, and it’s free.
What the number looks like depends on what you’re actually building. A garage conversion and a driveway replacement are both “construction,” and they sit at opposite ends of the range. Below, we lay out estimated Mercer Island pricing by project type, then explain what pushes a job toward the top of its range and what keeps it near the bottom.
Key Takeaways
- Full construction and ADU projects in Mercer Island: typical estimates of $90,000 – $220,000.
- Kitchen remodel: $14,000 – $45,000. Bathroom remodel: $9,000 – $28,000.
- Home addition: $45,000 – $130,000. Garage conversion: $30,000 – $80,000.
- Roof, window, and driveway work sit in the $250 – $40,000 band depending on scope and material.
- Material selection drives most of the spread. We help you choose, source, and install without the runaround between contractor and supplier.

Construction Cost Breakdown (2026)
These are typical estimated ranges for the Mercer Island market in 2026. They cover materials and labor for a standard residential job. Your written estimate after an on-site review is the number that counts.
| Project | Typical Estimated Range |
|---|---|
| ADU Construction | $90,000 – $220,000 |
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Backsplash Installation | $800 – $2,500 |
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
| Roof Replacement | $8,000 – $20,000 |
| Roof Repair | $400 – $1,800 |
| Metal Roof Installation | $15,000 – $40,000 |
| Tile Roof Repair | $600 – $2,500 |
| Window Replacement | $4,500 – $15,000 |
| Paver Driveway Installation | $7,000 – $18,000 |
| Concrete Driveway Installation | $4,500 – $12,000 |
| Asphalt Driveway Paving | $3,500 – $9,000 |
| Driveway Replacement | $5,000 – $14,000 |
| Driveway Sealing | $250 – $700 |
| Paver Patio Installation | $3,500 – $11,000 |
| Vinyl Fence Installation | $3,500 – $9,000 |
| Aluminum Fence Installation | $4,000 – $10,000 |
What pushes a job toward the top of its range? Material grade, first. A kitchen with Cambria quartz counters and Wellborn semi-custom cabinetry costs more than the same footprint with a stock cabinet line and a laminate top, and it lasts longer. A metal roof runs roughly twice a standard roof replacement because of the material cost and the panel detailing. Structural work, permit scope, and site access fill in the rest. On Mercer Island, a sloped lot or a tight driveway can add labor time that a flat lot with easy truck access never sees.
At the bottom of each range you’ll find smaller footprints, standard finishes, and projects where the plumbing and electrical layout doesn’t move. That last point matters more than most homeowners expect. A bathroom remodel that keeps the fixtures where they are costs a good deal less than one that relocates the toilet and the shower drain.
What Affects Construction Pricing in Mercer Island
- Lot grade and drainage. Many Mercer Island properties sit on a slope, and that changes foundation, retaining, and drainage work on additions and ADUs. A flat lot with a straightforward pour is cheaper to build on.
- Permit scope and design review. Additions, ADUs, and structural changes go through city permitting and plan review. Most cities require a permit for work of this size, so ask Mercer Island’s building department what your project needs before the estimate is final. Permit fees and review time are part of the budget.
- Material selection. This is where the brand conversations happen. We work with Cambria, Silestone, and Caesarstone for quartz and stone surfaces, and with KraftMaid and Wellborn for cabinetry. We also cover fixtures across Kohler, Toto, Grohe, Moen, Delta, American Standard, and Blanco. Whether you prefer Kohler’s design-forward aesthetic or Toto’s engineering precision, we work with both, and the price difference between them is real.
- Structural and mechanical changes. Moving a load-bearing wall, adding a bathroom, or upgrading the electrical panel adds cost. It also adds the kind of work that has to be done right the first time.
- Whole-home scope versus single-room. A single-company scope across remodeling, flooring, and painting usually trims cost compared with juggling separate contractors, because there’s one schedule and one point of accountability from demolition to final coat.
- Exterior product specification. James Hardie siding, premium window systems, and GAF, CertainTeed, or Owens Corning roofing each carry their own price band, and James Hardie products require product-specific installation knowledge to keep the warranty intact. That’s a labor detail that shows up in the quote.
If you want the broader picture of what we do across the region, start with Bellevue Remodeling Pros and we’ll point you to the right project page from there.

How to Save on Construction
Saving on a remodel isn’t about chasing the lowest bid. It’s about spending where the money shows and holding back where it doesn’t.
- Keep the plumbing and electrical layout. A tub-to-shower conversion that reuses the existing drain runs $3,500 – $10,000. Move the drain to the other wall and you’re paying for tile tear-out plus rough plumbing.
- Put the money in the surfaces you touch. Quartz counters, cabinet hardware, and fixtures are what you notice every day. Cambria quartz is non-porous, scratch-resistant, and backed by a full warranty, and that’s a genuine reason to spend there rather than on a showpiece ceiling.
- Choose semi-custom over full custom cabinetry. KraftMaid and Wellborn both offer strong semi-custom lines that hold up for years, and they cost less than a full custom shop build. You get the storage layout you want without the custom markup.
- Bundle scope. A kitchen remodel plus flooring plus interior paint under one company means one mobilization, one schedule, and fewer gaps where two trades wait on each other.
- Handle the small stuff in phases. Backsplash ($800 – $2,500) and vanity installation ($800 – $3,000) are the kind of jobs that can wait a season if the budget is tight, and they don’t hold up the rest of the build.
- Get the estimate in writing. A written estimate protects you from mid-project surprises. Ours is free, and there’s no pressure to book on the spot.
One scheduling note: our phones are answered all day and night, so you can call when it’s convenient for you. If you’re planning a project and want a number to work from, call (425) 675-0145 for a free estimate. Fast dispatch from 7am to 7pm for on-site visits.
FAQs – Construction Cost
How much does a kitchen remodel cost in Mercer Island?
A kitchen remodel in Mercer Island typically runs $14,000 – $45,000, with small kitchens at $9,000 – $20,000. Cabinets ($4,000 – $13,000), countertops ($2,000 – $6,500), and a backsplash ($800 – $2,500) make up the core of the budget, and cabinet grade is the biggest lever. Call (425) 675-0145 for an exact quote on your kitchen.
How much does an ADU cost to build in Mercer Island?
ADU construction in Mercer Island typically runs $90,000 – $220,000. The spread comes down to size, foundation type, and whether the unit is attached or detached. We work with prefab and ADU brands like Abodu and Dvele alongside stick-built options, so you can compare approaches before you commit. Call (425) 675-0145 for a free estimate.
Is it cheaper to remodel or build an addition?
Remodeling is almost always cheaper than building an addition. A kitchen remodel at $14,000 – $45,000 or a bathroom remodel at $9,000 – $28,000 costs far less than a home addition at $45,000 – $130,000. An addition makes sense when you need space you can’t get by reworking what you have. Call (425) 675-0145 and we’ll walk through both options with you.
How much does a bathroom remodel cost in Mercer Island?
A bathroom remodel in Mercer Island typically costs $9,000 – $28,000, with small bathrooms at $5,000 – $12,000. A walk-in shower installation runs $4,500 – $12,000 and a tub-to-shower conversion $3,500 – $10,000. Fixture choice moves the number: Kohler, Toto, Grohe, Moen, Delta, American Standard, and Blanco each price differently, and we install all of them. Call (425) 675-0145 for a free estimate.
Can you come today?
Same-day service is often possible for smaller jobs and site visits. Call (425) 675-0145 early and we’ll tell you what’s open. We answer all day and night. A call outside dispatch hours is booked into the next opening, Sunday through Friday, 7am to 7pm.
Get a Real Number for Your Mercer Island Project
Estimates are free, and the written estimate sets the final price. We help you select, source, and install across cabinet, countertop, fixture, flooring, window, door, and roofing brands, so your remodel gets the material it deserves rather than whatever a single supplier happens to stock. From a $250 driveway seal to a full ADU build, the process starts the same way: a call and a site review.
Call (425) 675-0145 for a free estimate. We answer all day and night. Fast dispatch from 7am to 7pm, Sunday through Friday.
Pricing reflects the Mercer Island market as of 2026. Bellevue Remodeling Pros offers free estimates – call (425) 675-0145.
Written by the team at Bellevue Remodeling Pros.
What Our Customers Say
"The foundation survey came back dead on. Everything downstream of that being square is the reason the rest of the build went smoothly."
- Wade Fletcher"Weekly site meeting, every week, with a written summary afterward. I always knew where the money and the schedule stood."
- Daniel Barrett"Ground up build. Permits, foundation, framing, all of it, and he ran the schedule tightly enough that the subs were never tripping over each other. Finished within a month of a fourteen month estimate."
- Nabil Mansour












